I told you the name of this blog was ironic. It is a month since I posted about the great flood. Things are moving along nicely in the basement of the Proehl Center, where Service Master's restoration department are replacing the panneling and door surrounds and even the vanity in the bathroom. It should be done this week, although probably not in time to put all the rummage in the basement in order for the vestry to have lunch with the Bishop there... We'll decide about that by the end of today.
Anyway, these are pics of the basement work in progress. Where there was drywall, as in bathroom, they cut wet part out and replaced it. Where there was panelling, they put panelling, painted white so it will be a little brighter down there.
The elevator/jewel box project, you ask?
Well. I know it just looks like Diestelkamp has just parked the trailer and port-a-potty and gone on vacation but apparently they were waiting for various things they need to be designed and fabricated and for more detail on electrical work and HVAC and... well... they plan to start next week. Kim has been following the project closely and working with the architect and the builders behind the scenes. Apparently, once everything is ready, the project won't take long at all...
Meanwhile in Montreal, Juget-Sinclair are almost half way along with the organ. I guess that will go in another post.
No comments:
Post a Comment